Projects can vary in duration
from 1 week to months.
Safety on the jobsite is our Number 1 concern, not only
for employees but also the environment. On completion
of the project, the safe return of our employees and
equipment is the reason we’re #1.
The unloading procedure
required when the pipe arrives at location is either “stockpiling” or “stringing” as
shown above.
Having safely arrived at
location, the job of unloading pipe from the truck and
trailer with a side boom.
When the trucks are loaded
with large diameter pipe, the cargo is then transported
to location by truck and trailer. Getting the pipe to
location can be on normal Canadian highways, or the trip
can be a test of the skill our drivers must possess.
Premay will also arrange
delivery of pipe by rail car as a cost effective alternative
and then transport by truck to the job location.
INITIATE
PROJECT
Once we’re successful in
being awarded the project, the real work begins.
Hiring drivers, crane
operators and labourers from the various unions.
Pre-trip
safety inspections on all equipment to be used
on this project.
Finalizing on location arrangements.
Quoting a project
Building a pipeline
is a Canada wide project. Everyone needs fuel, either
for their home or vehicle. Today it is a necessity
of life. This page in our website will give you a background
from start to finish in our part of building a pipeline.