INITIATE THE PROJECT
Once awarded the project, the real work begins.
• Dispatch of drivers, operators and laborers from the various unions.
• Pre-trip safety inspections on all equipment.
• Finalizing arrangements for haul routes, accommodation of crew, and marshalling points for
Project Orientation.

TRANSPORTATION
By Rail: Premay will arrange delivery of pipe by rail car to a designated location, unload and
transport pipe by truck to the job location.
By Truck: Once pipe is loaded the cargo is then transported to location by truck and trailer.
Travelling on Main Highways, Secondary and private roadways pipe is transported to location.

UNLOADING
Having safely arrived at location, the job of unloading pipe from the truck and trailer with
specified unloading equipment.
Stockpile: Pipe is unloaded from the truck and trailer and placed into specific pattern creating
a pile.
Stringing: Pipe is unloaded and “strung” along the right-of-way.

COMPLETION
On completion of the project, the safe return of our employees and equipment is the reason
we’re number one.